The next machine, which should increase our capacities in the future, was delivered at the end of April. The new machine was transported with four trucks and a lot of equipment. Afterwards it was lifted into our hall with a truck crane. After that, things really got going, as additional work facilitations such as a robot, glass cage and conveyor belt had to be installed. In this way we can continue to guarantee the highest product quality and speed.